Skip to content
Bitta Apps

Industries · Manufacturing

Business Central for Manufacturing

Bill of materials, routing, capacity planning, and shop floor control that connect your production lines directly to your ledger.

The pattern

What we hear from manufacturers

  • Disjointed shop floor operations

    Production orders are tracked on whiteboards or complex Excel sheets. Costs aren't updated until the month is already closed.

  • Inaccurate capacity planning

    Machine centers and work centers are perpetually overloaded because scheduling lacks real-time data on material availability.

  • Opaque production costs

    Scrap, rework, and outside processing overhead aren't properly captured, so true gross margins are hard to see.

After

After Business Central is live

Each of these is configured, tested with your team and signed off before go-live.
  • Integrated MRP and MPS

    Planners get production, purchase and transfer order suggestions from the planning worksheet, driven by sales orders, forecasts and each item's reordering and manufacturing policy.

  • Standard costing with variance analysis

    Standard costs roll up material, capacity, subcontracting and overhead through your BOMs and routings, and Business Central records the variance between actual and standard cost on production orders.

  • Routing visibility on the floor

    Consumption, output, run time and scrap post against routing operations, so supervisors see where each order stands and how loaded each work and machine center is.

  • BOM and routing migration you can verify

    Your items, multilevel BOMs, routings, work centers and machine centers arrive with rolled-up costs and component lists that engineering has checked against your current system.

  • Subcontracted operations

    Outside processing sits on the routing as vendor work centers, costed per unit or by time. The subcontracting worksheet creates purchase orders from released production orders, and Microsoft's newer Subcontracting app adds component transfers to the subcontractor.

FAQ

Frequently asked questions

Ask us something else
Do we need the Premium license for manufacturing?

Yes, for anyone working in your manufacturing company. Microsoft documents production orders, production BOMs, routings and work and machine centers as Premium features, and within one Business Central environment all full users must be on the same tier, so every full user in that environment needs Premium. Microsoft's licensing guide allows Essentials and Premium in separate environments on the same tenant, and Team Members licenses are sized separately. We confirm the right structure during discovery.

Can Business Central handle make-to-order and make-to-stock?

Yes. Each item, or each stockkeeping unit at a location, has a Manufacturing Policy of Make-to-Stock or Make-to-Order. For make-to-order items, planning creates order proposals linked to the specific demand and follows the BOM for components that are also make-to-order. You can also create production orders directly from a sales order. We map policies with your planners and test mixed cases, such as stocked subassemblies inside a make-to-order product, before go-live.

How do you migrate BOMs and routings?

We extract item, BOM, routing, work center and machine center data from your current system, clean it with your engineering team, and load it in dependency order with configuration packages. A sandbox trial load checks multilevel structures, units of measure, scrap percentages and routing links. Engineering approves a sample of rolled-up costs and component lists before the final load, and open production orders get an explicit cutover plan.

Can we track lots and serial numbers through production?

Yes. With item tracking codes set up, Business Central records serial, lot and package numbers on inbound and outbound transactions, including component consumption and production output, and the Item Tracing page follows a number backward to its components or forward to the customers who received it. We decide which items need tracking, migrate opening lots and serials, and test a full trace before go-live.

Is shop-floor data collection part of the implementation?

Only when it is scoped. Standard Business Central records consumption, output and time through journals, with flushing methods that can post some of it automatically. Barcode terminals, machine data collection or a separate MES usually involve a third-party app or integration work. We document which events post where and who owns exceptions, and list device and app costs separately in the proposal.

How does a manufacturing engagement start?

With a free discovery call on your products, BOM depth, costing method and planning. Where deeper analysis is needed, we agree a paid assessment first. The written proposal then sets deliverables, acceptance criteria, exclusions, milestone dates and a fixed price before build work starts. Typical implementations take 8 to 16 weeks; multilevel BOMs and shop-floor integrations can push toward the back of that range. Published bands begin at $28,500, and every implementation includes 30 days of hypercare.

Next step

Scope a Business Central engagement for your manufacturing operation with Bitta Apps.

A call with the team that would deliver your project. Written fixed-price proposal five business days later.

A Business Central consultant replies within one business day.